Aktuelles

Stuttgart main sewage treatment plant commissions the first PAC plants from SCHAUB

The main sewage treatment plant in Stuttgart-Mühlhausen was expanded to a 4th treatment stage for the elimination of trace substances.

SES (Stadtentwässerung Stuttgart) has decided to equip the Stuttgart-Mühlhausen wastewater treatment plant with a fourth purification stage. For this purpose, powdered activated carbon (PAC) is introduced into the biology or filter system at a final 4 dosing points. SCHAUB has now delivered, installed and commissioned the first 2 plants. With their modern colour design, they have become beacons for sustainable water management.

You can find more information about the elimination of trace substances at HKW S-Mühlhausen here. 

People in front of a silo with steel spiral staircases